Staff Mail       |     Intranet

config

 logo2

ESIA and RAP DOCUMENTS

S/NO. ITEM DESCRIPTION DOWNLOADS DATE POSTED
1. RESETTLEMENT ACTION PLAN (RAP) FOR UPGRADING TO BITUMEN STANDARDS OF ISIOLO - KULAMAWE - MODOGASHE (A13) ROAD SECTION RAP REPORT APRIL 2020
2. RESETTLEMENT ACTION PLAN (RAP) FOR UPGRADING TO BITUMEN STANDARDS OF WAJIR – ELWAK ROAD SECTION 175 KM (A13) RAP REPORT 4TH FEBRUARY 2020
3. RESETTLEMENT ACTION PLAN (RAP) FOR UPGRADING TO BITUMEN STANDARDS OF MODOGASHE-SAMATAR-WAJIR ROAD SECTION 157KM (A13) RAP REPORT 30TH JANUARY 2020
4. REPORT ON IDENTIFICATION OF POTENTIAL GENDER BARRIERS, GENDER INEQUALITIES, GAPS AND ENTRY POINTS FOR GENDER MAINSTREAMING IN ROAD INFRASTRUCTURE. REPORT 18TH DECEMBER 2019
5. ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) PROJECT REPORT FOR UPGRADING TO BITUMEN STANDARDS OF MODOGASHE  - WAJIR ROAD SECTION 157 KM (A13) ESIA REPORT 16TH DECEMBER 2019
6. REVIEW AND UPDATE OF THE ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE PROPOSED UPGRADING TO BITUMEN STANDARDS OF MODOGASHE - SAMATAR - WAJIR ROAD SECTION 157KM (A13) ESIA REPORT  
7. CONSTRUCTION OF REGIONAL MOMBASA PORT ACCESS PROJECT:
MOMBASA -MARIAKANI (A109) HIGHWAY PROJECT:
LOT 2 KWA JOMVU – MARIAKANI SECTION (30.4 KM)
ENVIRONMENTAL AND SOCIAL MANAGEMENT AND MONITORING PLAN
NON-TECHNICAL SUMMARY 2ND DECEMBER 2019
8. RESETTLEMENT ACTION PLAN (RAP) FOR UPGRADING TO BITUMEN STANDARDS OF ISIOLO – KULAMAWE – MODOGASHE ROAD SECTION, 190 KM (A13) RAP REPORT 29TH NOVEMBER 2019
9. NORTH EASTERN TRANSPORT IMPROVEMENT PROJECT (NETIP),RESETTLEMENT POLICY FRAMEWORK (RPF) CONSTRUCTION OF ISIOLO – MANDERA (A 13) ROAD RPF REPORT 29TH NOVEMBER 2019
10. ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) PROJECT REPORT FOR UPGRADING TO BITUMEN STANDARDS OF ISIOLO – MODOGASHE ROAD SECTION 190KM (A10/B84) ESIA REPORT 28TH NOVEMBER 2019
11. ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT PROJECT REPORT OF WAJIR – EL WAK (A13) ROAD ESIA REPORT 28TH NOVEMBER 2019
12. NORTH EASTERN TRANSPORT IMPROVEMENT PROJECT (NETIP), ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK (ESMF) CONSTRUCTION OF ISIOLO – MANDERA (A 13) ROAD ESM FRAMEWORK 28TH NOVEMBER 2019
13. SOCIAL ASSESSMENT FOR THE PROPOSED UPGRADING OF ISIOLO-WAJIR-MANDERA ROAD CORRIDOR (A13) SOCIAL ASSESSMENT REPORT 28TH NOVEMBER 2019
14. ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT STUDY REPORT FOR THE MOMBASA GATE BRIDGE CONSTRUCTION PROJECT: VOLUME ONE ESIA REPORT 17TH APRIL 2019
15. RESETTLEMENT ACTION PLAN FINAL REPORT RAP FINAL REPORT 17TH APRIL 2019
16.

NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT (NUTRIP)
CONSULTANCY SERVICES FOR PREPARING ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) FOR SELECTED ROADS ADJOINING MAJOR TOWNS

i)ESIA TORs - FEASIBILTY STUDIES

ii)TOR  DISCLOSURE  MEMO

24TH OCT 2018
17. NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT (NUTRIP)
TERMS OF REFFERENCE FOR THE CONSULTANCY SERVICES FOR THE FEASIBILITY STUDY
EVIROMENTAL AND SOCIAL IMPACT ASSESMENT,RESETTLEMENT ACTION PLAN FOR THE PROPOSED CONSTRUCTION OF KISUMU NORTHERN BYPASS AND
SELECTED ROADS AND ADJOINING MAJOR TOWNS

ESIA Kisumu Northern bypass

RAP Kisumu Northern bypass

Selected Roads RAP  

 12th Oct 2018
18.

PROPOSED DEVELOPMENT, OPERATIONS AND MAINTENANCE OF THE NAIROBI - NAKURU – MAU SUMMIT (A8) HIGHWAY (PPP) PROJECT

RESETTLEMENT ACTION PLAN

JULY 2018

RAP REPORT  17th JULY 2018
19. NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT (NUTRIP)
REHABILITATION AND CAPACITY ENHANCEMENT OF JAMES GICHURU ROAD JUNCTION – RIRONI HIGHWAY (A104)
SUB-LOT 3A: UTHIRU - WESTLANDS SECTION
RESETTLEMENT ACTION PLAN (UPDATE)
FINAL REPORT
APRIL 2018
RAP FINAL REPORT 13TH APRIL 2018
20.

NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT (NUTRIP)

REHABILITATION AND CAPACITY ENHANCEMENT OF JAMES GICHURU ROAD JUNCTION – RIRONI HIGHWAY (A104)

SUB-LOT 3B: UTHIRU– ZAMBEZI SECTION

RESETTLEMENT ACTION PLAN (UPDATE)

FINAL REPORT

RAP FINAL REPORT
29TH DEC 2017
21.

NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT (NUTRIP)

REHABILITATION AND CAPACITY ENHANCEMENT OF JAMES GICHURU ROAD JUNCTION – RIRONI HIGHWAY (A104)

SUB-LOT 3C: ZAMBEZI - RIRONI SECTION

RESETTLEMENT ACTION PLAN (UPDATE)

FINAL REPORT

AUGUST 2018
RAP REPORT 2ND AUGUST 2017

 

 



1479988088 location pin logo social media

Find Us At;Barabara Plaza, Off Airport South Road, Opp. KCAA HQs.

Let's go social

fb1   twitter1   1478812163 social square google plus1   1478812150 social youtube square1   1478812020 Instagram   1478812106 social linkedin square1  

News letter

This module can not work without the AcyMailing Component